Manifa Causeway Project
The Project comprises the design and construction of some 41 km of Main Causeway and associated lateral (secondary) causeways which provide vehicle and services access to 25 drilling / production islands and 2 water injection islands.
A 2.4km Long Bridge at the southern end of the Main Causeway together with five numbers of short (180m) bridges and eight banks of culverts spaced along the causeways.
A 2.4km Long Bridge at the southern end of the Main Causeway together with five numbers of short (180m) bridges and eight banks of culverts spaced along the causeways.
Specifications
- Client: Saudi Aramco
- Constructor: Jan De Nul
- Consultant: STFA Marine Cons. Co.
- Country: Saudi Arabia
- Project Date: April 2007
- Project Status: Completed