EPIC For Gabro Berth Expansion (Package -1) At Mesaieed

Substation Building has been designed as reinforced concrete building formed of frames and structural walls and flat slabs connecting each other. Mat foundation system has been formed due to occurring loads and soil conditions. of the project “QATAR GABBRO BERTH-3 EXPANSION AT MESAIEED PORT (PACKAGE-1)

Specifications

  • Client: Qatar Petroleum
  • Constructor: Jan De Nul
  • Consultant: STFA Marine Cons. Co.
  • Country: Qatar
  • Project Date: June 2008
  • Project Status: Completed