Total Haramidere Terminal Seismic Evaluation and Retrofit Design

Seismic Evaluation and Retrofitting Design of the 4 building of TOTAL Oil A.Ş.
  • Gate Control Building (RC Building)
  • Social Facility Building (RC Building)
  • Commerce Building (RC Building)
  • Pump Shelter  (Steel Building)

Specifications

  • Client: Total Oil Türkiye A.Ş.
  • Country: Turkey
  • Project Date: May 2004
  • Project Status: Completed