EPIC For Container Terminal (Berth No. 7) At Mesaieed Port

Firewater (FW), Potable Water (PW), Sewer Water (SW) system design by HDP and PVC pipes. Pre-cast concrete manholes and handholes have been designed in lieu of the project specifications.

Specifications

  • Client: Qatar Petroleum
  • Constructor: STFA Marine Cons. Co.
  • Country: Qatar
  • Project Date: October 2008
  • Project Status: Completed