Bandırma CCPP Cooling Water Inlet/Outlet System And Shore Works At Pump House Locatıon Engineering And Consultancy Services
The Closed Cycle Power Plant to be built at Bandırma by EnerjiSa will have the pump station to be built on the reclamation to be built at the coastline. The intake and outfall pipelines will be installed from shore to -20m and -30m water depths respectively
Specifications
- Client: Enerjisa
- Constructor: Kalemci Yapi Endüstri Ve Ticaret A.Ş.
- Consultant: CITC Danışmanlık, Consultants for International Tenders and Contracts In cooperation with ARG Coastal and Harbour Engineering Company
- Country: Turkey
- Project Date: August 2008
- Project Status: Completed